Arcos Alvarez, Antonio Alfonso antonio.arcos@upm.es

Actividades

A quarry for the construction of a Roman camp next to the Celtiberian city of Deza during the Sertorian Wars (Soria, Spain)

  • Pérez, ES
  • Alcalde, VA
  • Alvarez, AAA
  • Bazán, AM
  • de Ojeda, AS

Archaeological And Anthropological Sciences - 1/4/2023

10.1007/s12520-023-01736-1 Ver en origen

  • ISSN 18669565

Open video library on sustainable Engineering and Architecture

  • JESÚS MARÍA ALONSO TRIGUEROS, ANTONIO ALFONSO ARCOS-ÁLVAREZ, Marco Castrillón-López, Daniel Ortega-Rodrigo, Sonsoles Pérez-Gómez, Eugenia Rosado-María, María-Jesús Vázquez-Gallo

16th International Technology, Education And Development Conference (p. 8286-8293) - 8/3/2022

10.21125/inted.2022.2107 Ver en origen

New Use of BIM-Origami-Based Techniques for Energy Optimisation of Buildings

  • Pavon, RM
  • Bazan, AM
  • Cepa, JJ
  • Alvarez, AAA
  • Trigueros, JMA
  • Alberti, MG
  • Tellaeche, JR
... Ver más Contraer

Applied Sciences-Basel - 1/1/2022

10.3390/app12031496 Ver en origen

  • ISSN 20763417

Measurement-While-Drilling Based Estimation of Dynamic Penetrometer Values Using Decision Trees and Random Forests

  • García, EM
  • Alberti, MG
  • Alvarez, AAA

Applied Sciences-Basel - 1/1/2022

10.3390/app12094565 Ver en origen

  • ISSN 20763417

Use of BIM-FM to Transform Large Conventional Public Buildings into Efficient and Smart Sustainable Buildings

  • Pavón, RM
  • Alberti, MG
  • Alvarez, AAA
  • Carrasco, IDC

Energies - 1/6/2021

10.3390/en14113127 Ver en origen

  • ISSN 19961073

BIM-Based Methodology for the Management of Public Heritage. CASE Study: Algeciras Market Hall

  • Bazán, AM
  • Alberti, MG
  • Alvarez, AAA
  • Pavón, RM
  • Barbado, AG

Applied Sciences-Basel - 1/1/2021

10.3390/app112411899 Ver en origen

  • ISSN 20763417

Uso de la metodología BIM en la remodelación de un puente existente = Use of BIM methodology in the re-modelling of an existing bridge

  • Blanco Rávena, Rafael
  • Martínez García, Jorge
  • Mozas González, Borja
  • García Alberti, Marcos
  • Arcos Álvarez, Antonio A.

Anales De Edificacion - 29/4/2020

10.20868/ade.2019.4376 Ver en origen

  • ISSN 24441309

New Perspectives for BIM Usage in Transportation Infrastructure Projects

  • Bazán, AM
  • Alberti, MG
  • Alvarez, AA
  • Trigueros, JA

Applied Sciences-Basel (p. 1-22) - 2/10/2020

10.3390/app10207072 Ver en origen

  • ISSN 20763417

BIM-Based Educational and Facility Management of Large University Venues

  • Pavón, RM
  • Alvarez, AAA
  • Alberti, MG

Applied Sciences-Basel (p. 1-28) - 1/1/2020

10.3390/app10227976 Ver en origen

  • ISSN 20763417

Possibilities of BIM-FM for the Management of COVID in Public Buildings

  • Pavón, RM
  • Alvarez, AAA
  • Alberti, MG

Sustainability (p. 1-21) - 1/1/2020

10.3390/su12239974 Ver en origen

  • ISSN 20711050

El Sistema de Planos Acotados en la Ingeniería Civil

  • ARCOS ALVAREZ, ANTONIO ALFONSO

26/3/2020

  • iMarina

El Sistema de Planos Acotados en la Ingeniería Civil. IberGarceta Publicaciones. - 2020. ISBN 978-84-1728-951-5. 280pag.

  • ARCOS ALVAREZ, ANTONIO ALFONSO

1/10/2020

  • iMarina

Las deformaciones producidas en los sedimentos por el paso de grandes dinosaurios: el caso del yacimiento de saurópodos de Miraflores I, Fuentes de Magaña (Soria, España)

  • Antonio Alfonso Arcos Álvarez
  • Eugenio Sanz Pérez
  • Carlos Pascual Arribas
  • Santiago Uriel Romero
  • Pedro Latorre Macarrón
  • Nieves Hernández Medrano

Proceedings Of The 3rd Internactional, I.E. International, Symposium About Paleontology Of Dinosaurs And Their Environment (p. 193-222) - 1/1/2004

  • iMarina

La Cantera Para La Construccion Del Campamento Romano De Deza (Soria) Durante Las Guerras Sertorianas

  • Sanz Pérez, Eugenio (Autor o Coautor)
  • ARCOS ALVAREZ, ANTONIO ALFONSO (Autor o Coautor)
  • MORENO BAZAN, ANGELA (Autor o Coautor)
  • Sanz de Ojeda, Joaquin (Autor o Coautor)

(p. 182-189) - 26/9/2023

  • iMarina

BIM Methodology in the Teaching of Graphic Expression in Civil Engineering

  • Bazán ÁM
  • Domínguez SS
  • Álvarez AAA
  • Trigueros JMA

Lecture Notes In Mechanical Engineering (p. 313-324) - 1/1/2023

10.1007/978-3-031-20325-1_25 Ver en origen

  • ISBN 978-3-031-20325-1
  • ISSN 21954364

Hollow precast driven pile extended by a micropile: dynamic load tests and modelling

  • ARCOS ALVAREZ, ANTONIO ALFONSO

20/9/2022

  • iMarina

Caracterización del terreno atravesado durante la ejecución de Columnas de Módulo Controlado mediante algoritmos de machine learning

  • Eduardo Martinez García
  • Marcos García Alberti
  • Antonio Alfonso Arcos Álvarez

Xi Simposio Nacional De Ingeniería Geotécnica La Geotecnia En Apoyo De La Seguridad Y El Desarrollo Sostenible - 26/5/2022

  • iMarina

BIM Projects Beyond Construction Models

  • Ángela Moreno Bazán
  • Marcos García Alberti
  • Antonio A. Arcos Álvarez

23/3/2022

  • iMarina

BIM in Industrialized Construction

  • ARCOS ALVAREZ, ANTONIO ALFONSO

24/3/2021

  • iMarina

Building Information Modeling for University Facility Management

  • ARCOS ALVAREZ, ANTONIO ALFONSO

24/3/2021

  • iMarina

Applying BIM to the Modeling of an Arco Dam

  • ARCOS ALVAREZ, ANTONIO ALFONSO

24/3/2021

  • iMarina

BIM-Based management system for flyover bridges

  • MORENO BAZAN, ANGELA

24/3/2021

  • ISBN M-8072-2021
  • iMarina

Experiences on hybrid face-to-face and online teaching for Smart Construction: BIM

  • MORENO BAZAN, ANGELA

24/3/2021

m-8071-2021 Ver en origen

Este/a investigador/a no tiene documentos de trabajo.

Este/a investigador/a no tiene informes técnicos.

REDES NEURONALES Y TÉCNICAS DE OPTIMIZACIÓN PARA EL DISEÑO Y MANTENIMIENTO SEGURO DE INFRAESTRUCTURAS DEL TRANSPORTE: GEOTECNIA DE ROCAS VOLCÁNICAS Y ESTABILIDAD DE TALUDES

  • MILLAN MUÑOZ, MIGUEL ANGEL (Investigador principal (IP))
  • MENCIAS CARRIZOSA, DAVID (Miembro del equipo de trabajo)
  • MOLINA GOMEZ, FAUSTO ANDRES (Miembro del equipo de trabajo)
  • Santos de Alencar NA, Ana Teresa (Miembro del equipo de trabajo)
  • Serrano NA, Alcibiades (Miembro del equipo de trabajo)
  • HERRERO NA, MARÍA JOSEFA (Participante)
  • HERRERO NA, MARÍA JOSEFA (Miembro del equipo de trabajo)
  • Hernandez Gutierrez, Luis Enrique (Participante)
  • Hernandez Gutierrez, Luis Enrique (Miembro del equipo de trabajo)
  • Hernández NA, Luis Enrique (Miembro del equipo de trabajo)
  • PICARDO PÉREZ, ALBERTO (Miembro del equipo de trabajo)
  • Picardo NA, Alberto (Miembro del equipo de trabajo)
  • Picardo NA, Alberto (Participante)
  • Herrero Fernández, María Josefa (Miembro del equipo de trabajo)
  • Herrero Fernández, María Josefa (Participante)
  • ESCAVY FERNANDEZ, JOSE IGNACIO (Participante)
  • GONZALEZ GALINDO, JESUS (Participante)
  • ARCOS ALVAREZ, ANTONIO ALFONSO (Participante)
  • SANTOS DE ALENCAR, ANA TERESA (Participante)
  • RODRIGUEZ-MONTEVERDE CANTARELL, MARIA DEL PILAR (Participante)
  • GALINDO AIRES, RUBEN ANGEL (Investigador principal (IP))
... Ver más Contraer

Ejecución: 01-09-2023 - 31-08-2026

Tipo: Nacional

  • iMarina

DIGITAL TWINS FOR COMPLEX INFRASTRUCTURES AND URBAN ECOSYSTEMS

  • MARTIN STICKLE, MIGUEL (Participante)
  • ARCOS ALVAREZ, ANTONIO ALFONSO (Participante)
  • JIMENEZ GAÑAN, MIGUEL (Participante)
  • GARCIA ALBERTI, MARCOS (Participante)
  • FRUTOS CID, SONIA (Participante)
  • NAVAS ALMODOVAR, PEDRO (Participante)
  • ATIENZA RIERA, JOSE MIGUEL (Investigador principal (IP))
  • MANZANAL, DIEGO GUILLERMO (Participante)
  • ZANUY SANCHEZ, CARLOS (Investigador principal (IP))
  • SORIA HERRERA, JOSE MANUEL (Participante)
  • ZAMORANO MARTIN, CLARA ISABEL (Participante)
  • YAGÜE HERNAN, ANGEL (Participante)
  • MENENDEZ-PIDAL DE NAVASCUES, IGNACIO FAUSTINO (Participante)
  • ALVAREZ GALLEGO, SERGIO (Participante)
  • MUÑOZ DIAZ, IVAN (Participante)
  • MARTINEZ MARIN, RUBEN (Participante)
  • GONZALEZ TEJADA, IGNACIO (Investigador principal (IP))
  • González Guardia, Esteban (Participante)
  • SOBRINO VAZQUEZ, NATALIA (Participante)
  • Torres Fernández, Yolanda (Participante)
  • CAMARERO ORIVE, ALBERTO (Participante)
  • ARRANZ JUSTEL, JOSE JUAN (Participante)
  • ENFEDAQUE DIAZ, ALEJANDRO (Participante)
  • GALINDO AIRES, RUBEN ANGEL (Participante)
  • SANTILLAN SANCHEZ, DAVID (Participante)
  • CAMACHO RODRIGUEZ, LAURA (Participante)
  • Berrocal Menarguez, Ana Belen (Participante)
  • MOLINA SANCHEZ, RAFAEL (Participante)
  • GARCIA CUESTA, ESTEBAN (Participante)
  • SANZ DIEZ DE ULZURRUN CASALS, GONZALO (Participante)
  • Vaca Cabrero, Javier (Participante)
  • ENRIQUEZ RODRIGUEZ, RAFAEL (Participante)
  • ARCE RUIZ, ROSA MARIA (Participante)
  • MUÑOZ MEDINA, MARIA BELEN (Participante)
  • MAS LOPEZ, MARIA ISABEL (Participante)
  • CUETO-FELGUEROSO LANDEIRA, LUIS (Participante)
  • Marchamalo Sacristán, Miguel (Participante)
  • LOPEZ MORENO, GADOR MARIA (Participante)
  • ALCARAZ CARRILLO DE ALBORNOZ, VICENTE (Participante)
... Ver más Contraer

Ejecución: 01-11-2022 - 31-10-2026

Tipo: Internacional

Importe financiado: 1479542,50 Euros.

  • iMarina

Desarrollo y programación de sistemas inteligentes de gestión de infraestructuras basados en metodología Building Information Modelling

  • ARCOS ALVAREZ, ANTONIO ALFONSO (Director)
  • GARCIA ALBERTI, MARCOS (Director) Doctorando: Muñoz Pavón, Rubén

20/7/2023

  • iMarina

Este/a investigador/a no tiene patentes o licencias de software.

Última actualización de los datos: 28/08/24 13:22